We were surprised to see that there has been some very small changes in the house since our last visit as follows:
1. The house is actually locked up for a change (all windows are installed and all doors are locked) - this makes our viewing rather difficult and we haven't seen the upstairs section in weeks!
2. Garage has been plastered and cornices installed although no paint yet
3. Electrical fit offs are underway and looking good
4. Concrete floors look like they have been leveled so I presume the floorboards will be installed some time in early Jan
5. The stone bench tops are in (hooray!)
6. Tiling of wet areas is complete (no pics unfortunately since we can't enter the house anymore)
7. Front door and walk in pantry door has been stained (presumably the upstairs master bedroom doors have also been stained)